无标题文档
 您的位置:首页 >>案例 >>建筑设计 >>
 
Duoc企业大厦

时间:2009-03-19  来源:都市世界  作者:佚名

 
李铁:被误读的城镇化 2013城市发展与规划大会
2013年4月29-5月5日 张家界城镇体系规划
难题与对策:城镇化的路径选择 长沙天心城市设计
 

After the requirement of a building for the central offices of Duoc, there were four additional topics which were essential and needed to be solved. The first one, was the fact that the building’s location was in the yard of Antonio Varas branch, former German School and typical building of the neighborhood. The second problem was the coexistence of a functional activities program to concrete requirements of surface and the relationship with the image of a corporate building for an educational institution of “Universidad Católica de Chile”. The third problem was the constant change in the use of public spaces typical of an institution in permanent transformation and renovation. Finally, the necessity of a public place for the recreation of the students.

A fifteen stores tower that takes the ground level yard shape is designed and is taken to the upper floor. A band was thought for this purpose. This band is originated in a series of continuous bends, like an arabesque that conceptualizes and abstracts the idea of the branches and foliage of a tree. It goes all the way from the first floor to the last one defining the outer spaces and the double heights of the inners.

The empty spaces of the building are yards that are used as an extension of the educational and public areas and at the same time as a space to be related with the landscape.

This continued band is intercepted by a grid, an octagonal weft of pillars and girder which are the frame and building’s support which is exposed and are part of the expressive definition of the project. Because of the later development of the building’s structure, the explicit evidence of the band is lost. Keeping it’s trade on the disposition of the fullness and emptiness of the current volumetry.

The purpose of the empty spaces of the building is to allow the people to climb the urban weft in order to reach places to have a perfect view of the city. At the same time, this allows the continued sight through the openings.

The building’s plants look for their best efficiency organized like a regular structural weft of pillars which disposition facilitates the program’s resolution. The vertical core of the elevators, steps and humid zones are displaced from the axle to the south front of the building encompassing the circulations and services areas. This disposition is reflected in the volume and fronts.

The first and second floors are clear spaces that allow the continuity of the down yard of the building.

The closing of the front is conformed by a glass coat. A first shutting, has windows in all the establishments to incorporate natural ventilation. And a second shutting, like a screen made of reflective and pigmented glass, to control the radiation and the thermic transmission. These shuttings are joined like a knitting so that its reflection gives a volumetric texture to the vertical plane of the building’s front. This texture allows the educational building to look alive and be connected to the city.

 
上一页 页码:[<< 1 ...4 5 6 7 ] 下一页 共7页


打印】 【网站论坛】 【字体: 】 【发表评论】 【关闭
更多关于 Duoc企业大厦 的资料
· Jaya Skandamoorthy Building Research Establishment (BRE) [2013-04-23]
· 温哥华POT Incorporated公司的容器及景观设计 [2012-12-06]
· Building Climate Change Resilience [2007-08-09]
· 西班牙.马德里:Celosia 大楼 [2009-08-04]
· Jaya Skandamoorthy Building Research Establishment (BRE) [2012-06-04]
 
热点专题

资源型城市生态化转型道

进行中的“京津冀一体化

智能交通让城市发展更美

楼房坍塌,“快餐式建筑
行业人物.
学术论文
电子图纸
工程案例
丹佛艺术博物馆住宅
The Museum Residences是由美国著名建筑师Daniel Libeskind设计的。… [详情]
软件下载
考试信息
规划论坛
 
中华人民共和国住房和城乡建设部城乡规划管理中心  指定合作网站   城市发展与规划大会  官方网站
主办:中国城市科学研究会(CSUS)  承办:沃德高科(北京)科技有限公司 新浪微博 腾讯微博 微信 Add to Google
Copyright ©2007-2009 CITYUP.ORG.All Rights Reserved. 
通信地址:住房和城乡建设部北附楼312室(100835)
联系信箱:cityupcityup.org  传真电话:010-88585380
服务热线:010-88585610/11/12转803  QQ:325178919  325178913
版权所有: 都市世界-城市规划与交通网
京ICP备12048982号-3   京公安网备11010802020994号
关闭欢迎关注都市世界微信公众平台!